If you own a home on Lake Chatuge and want it featured on this guide, list it with Gold Peach Realty. Gold Peach Realty is the North Georgia brokerage that publishes Visit Lake Chatuge, and homes it lists appear on our Lake Chatuge homes page. You can read how Gold Peach Realty markets homes.
The lake is shared by Towns County, Georgia, and Clay County, North Carolina, and TVA’s shoreline rules apply on both sides. That is where a lake sale differs from an ordinary one.
What buyers will ask about first
Lake buyers ask about the water before the kitchen. On a TVA lake, that means the dock and the paperwork behind it.
Your Section 26a permit
Section 26a of the TVA Act requires a TVA permit before any shoreline construction, such as building a dock or stabilizing the shoreline (TVA). Find your permit now. If you can’t, TVA’s Public Land Information Center at (800) 882-5263 can provide copies of Section 26a permits (TVA).
Does what’s built match the permit?
TVA says all construction or alterations to the shoreline need its approval, even minor changes to the dock. A careful buyer will compare your permit with the dock in the water. Check the upper deck too: TVA allows a dock’s second story as an open deck with a railing, but not with a roof or enclosed with siding or screening. Under TVA’s residential rules, docks and walkways may not reach more than 150 feet from shore, or more than one-third of the way to the opposite shore, whichever is less (TVA).
The permit transfer
Permits do not transfer automatically with the property. Your buyer must apply to TVA for their own Section 26a permit within 60 days of closing. Tell buyers early so it is in their closing plan, and hand over your permit copy with the closing documents. Our 26a dock permit guide explains the process.
Section 26a permits do not transfer automatically. A new owner must apply to TVA within 60 days of closing. (TVA, checked Oct 17, 2026)
If you plan dock work before listing
TVA warns that processing a shoreline permit can take up to 120 days, and the application fee for minor alterations such as residential docks, piers and boathouses is $1,000 (TVA). If you want work done before you list, apply early. Otherwise, sell the dock as it is and say so.
Water levels and the dam project
Buyers who tour in winter will see a lower lake. In a normal year TVA lets Chatuge vary about 10 feet between summer and winter, so keep photos of your dock at both levels ready. Our lake levels guide explains the yearly curve.
Buyers may also ask about TVA’s spillway project. As of October 2026, TVA has not chosen an alternative. It expects a decision in early 2027 and construction between summer 2028 and fall 2029, and the alternatives under study would lower the lake to elevation 1,908 feet during off-season months (TVA). Point buyers to TVA’s page and our dam safety explainer rather than guessing.
A seller’s paperwork list
- Your TVA Section 26a permit, plus any later TVA approvals for dock changes or shoreline work.
- Any state water quality permit or waiver that went with a shoreline project. TVA may require one before it issues a 26a permit.
- Recent photos of the dock, ideally at summer and winter levels.
- Your latest property tax bill from Towns County, Georgia, or Clay County, North Carolina.
How featured listings work
Homes listed with Gold Peach Realty appear on our homes page with details from the MLS feed, next to plain answers about the permits buyers ask about. Nobody can honestly promise you a sale price, a closing date or a number of views, and we won’t.
Talk to Gold Peach Realty
Questions people ask
What should I gather before selling a Lake Chatuge home?
Start with your TVA Section 26a permit for the dock and any shoreline work. If you can't find it, TVA's Public Land Information Center at (800) 882-5263 can provide a copy.
Source: TVA, checked Oct 17, 2026
Does my buyer need a new TVA permit?
Yes. Permits do not automatically transfer with the property, and the new owner must apply to TVA for a Section 26a permit within 60 days of closing.
Source: TVA, checked Oct 17, 2026
Do I need TVA approval to change my dock before listing?
Yes. TVA says all construction or alterations to the shoreline require its approval, even minor changes to the dock.
Source: TVA, checked Oct 17, 2026
What should I tell buyers about TVA's dam safety project?
As of October 2026, TVA has not chosen an alternative. Those under study would lower the lake to 1,908 feet in off-season months, and TVA says a return to summer levels relies on rainfall and cannot be guaranteed.
Source: TVA, checked Oct 17, 2026

