On Lake Chatuge, the dock is TVA’s business. Section 26a of the TVA Act requires a permit before any shoreline construction begins, such as building a dock or stabilizing the shoreline, according to TVA. The rule applies the same way in Towns County, Georgia and Clay County, North Carolina, because the whole lake is a TVA reservoir on both sides of the state line.
Below is what TVA’s own pages say about what needs a permit, how far a dock can reach, what it costs, how long it takes, and the step buyers miss most often: permits do not transfer with the house.
What needs a permit
More than most people expect. TVA’s buying and selling guide says all construction or alterations to the shoreline require TVA approval, even minor changes to a dock. If you plan to build, add to or replace part of a dock, or to work on the bank, ask TVA first.
A state permit may be needed too. TVA says a project may also need a permit from your state’s water quality office, and TVA may not issue the 26a permit until you have that permit or a waiver. On Chatuge that means Georgia or North Carolina, depending on which shore the property is on. If you are not sure which side a cove falls on, our guide to the state line helps.
Dock size and design limits
TVA’s Section 26a regulations (18 CFR Part 1304) set a reach limit for residential docks: docks and walkways may not extend more than 150 feet from the shoreline, or more than one-third of the distance to the opposite shoreline, whichever is less. In a narrow cove, the one-third limit can be the shorter of the two.
Second stories have their own rule. TVA says a dock’s second story can be built as an open deck with a railing, but it cannot be covered with a roof or enclosed with siding or screening.
Those are not the only standards. The regulations cover more than we can summarize here, so read TVA’s pages or talk to TVA before you design or price a dock.
Fees and processing time
| Item | What TVA says |
|---|---|
| Application fee, minor shoreline alterations (residential docks, piers, boathouses) | $1,000 |
| Processing time | Can extend to 120 days |
| State water-quality permit | May be required, and TVA may wait for it or a waiver |
| Copy of an existing permit | Available from TVA’s Public Land Information Center, (800) 882-5263 |
The fee is per TVA’s shoreline permit FAQ, checked October 2026, so confirm it before you apply. Plan around the processing time: if you want new dock work finished for summer, start the application months ahead.
Buying a lake home: permits do not transfer
This is the rule that surprises buyers. TVA says Section 26a permits do not automatically transfer with property ownership, and the new owner is required to apply to TVA for a Section 26a permit within 60 days of closing.
Section 26a permits do not transfer automatically. A new owner must apply to TVA within 60 days of closing. (TVA, checked Oct 17, 2026)
In other words, a dock does not come with a house in any permit sense, and there is no grandfathering to lean on. Before you close:
- Ask the seller for a copy of the existing 26a permit. If no one can find it, TVA’s Public Land Information Center at (800) 882-5263 can provide a copy and information on TVA land rights at the location.
- Compare the permit with what is actually built. Because even minor dock changes need TVA approval, a roof, an enclosed upper level or an extension added later is worth a question before closing.
- Put the 60-day application deadline on your calendar the day you close.
The buyer checklist below walks through the same steps.
Decision tool
Before you buy on Lake Chatuge: the TVA shoreline checklist
Mark a question done when you have the answer. Nothing is sent to us; your progress is kept in this browser.
That's the list. Take it to your agent and to TVA before you sign anything.
Talk to Gold Peach Realty about Lake Chatuge
From TVA's Section 26a permitting pages and its Chatuge dam safety project page, checked October 17, 2026. This is a starting list, not legal advice.
Mistakes that cause trouble later
Most 26a problems come from assuming the rules are looser than they are. Each of these runs against something TVA states plainly:
- Treating an old dock as grandfathered. The permit does not pass to you automatically. You apply in your own name within 60 days of closing.
- Starting work before the permit is issued. TVA requires the permit before shoreline construction begins, not after.
- Calling a small change maintenance. TVA says even minor changes to a dock need its approval.
- Adding a roof or walls to the upper deck. A second story may be an open deck with a railing and nothing more.
- Forgetting the state. A water-quality permit or waiver from Georgia or North Carolina may be needed before TVA issues its permit.
Selling: get the paperwork together early
If you are selling, find your 26a permit before you list and check that the dock still matches it. A buyer’s questions are easier to answer at listing than in the middle of a closing. This guide’s publisher, Gold Peach Realty, works with buyers and sellers of North Georgia lake homes. Whoever you work with, put the permit near the top of the list. Our selling guide and Lake Chatuge homes page cover the rest of the process.
The spillway project and your dock
As of October 2026, TVA is studying fixes for Chatuge Dam’s spillway. If it chooses an action alternative, its project page describes off-season drawdowns to elevation 1,908 feet, about 10 feet below the current winter level, with refill depending on rainfall. No alternative has been selected, and TVA says construction could begin between summer 2028 and fall 2029. Whatever TVA decides, dock work still needs a 26a permit first.
Our dam safety project explainer has TVA’s timeline, and our lake levels page explains the normal seasonal swing.
Who to call
- TVA’s Public Land Information Center, (800) 882-5263, for copies of existing 26a permits and information on TVA land rights at a property.
- TVA’s shoreline permits page, for the application itself and current processing guidance.
- Your state’s water quality office, to ask whether your project also needs a state permit.
Questions about TVA 26a permits on Lake Chatuge
Does a TVA dock permit transfer when I buy a Lake Chatuge home?
No. TVA says Section 26a permits do not automatically transfer with property ownership, and the new owner must apply to TVA for a Section 26a permit within 60 days of closing.
Source: TVA, checked Oct 17, 2026
How much does a TVA dock permit cost?
Per TVA's shoreline permit FAQ, checked October 2026, the application fee for minor shoreline alterations such as residential docks, piers and boathouses is $1,000. Confirm the current fee with TVA before you apply.
Source: TVA, checked Oct 17, 2026
How far can a dock extend into Lake Chatuge?
Under TVA's Section 26a regulations, residential docks and walkways may not extend more than 150 feet from the shoreline or more than one-third of the distance to the opposite shoreline, whichever is less.
Source: TVA, checked Oct 17, 2026
How long does a TVA 26a permit take?
TVA warns that processing a shoreline permit application can take up to 120 days, so apply well before you want the work done.